The first phase of the roof solar plant in Changtai County has been completed

July 10 , 2018

--Make your idle roofs become power plants and cash printers.


In May 2017, Antaisolar has completed the first construction phase of its self-built roof solar plant by taking charge of the integrated services from investment, design, construction, connecting to grid and monitoring. The roof plant is installed on the cement roof of our factory in Zhangzhou, Fujian, covering the roof area of 2722 square meters.


The cement roof is flat, with no slant and no covering around. Therefore, based on the roof condition and the factory’s electricity consumption, the project utilized SC solar mounting system (installation angle of 20 °), with the installed capacity of 150 kilowatts. The project is expected to generate 150,000 KWh per year. Facing south solar array makes the whole system getting more sunlight all the year, which ensures the stable electricity generating, practical and economical.

During peak energy periods in summer, the electricity generated by the roof solar plant will be connected to the factory’s grid for production use. As a kind of strong supplement energy, the green power will create significant economic benefits for the operation of the factory.



  • Energy conservation and emission reduction:

Annual total generating capacity (KWh)

Average annual coal savings (tons)

Average annual CO2 emission reduction (tons)

Average annual SO2 emission reduction (tons)

Average annual nitrogen oxide reduction (tons)

Average annual dust emission reduction (tons)

150,000

49.2

149.55

4.5

2.25

40.8


  • economic income:

Annual total generating capacity (KWh)

Electricity price

RMB/KWh

Electricity subsidies

RMB/KWh

Annual generating income

*10,000 RMB/KWh

National total subsidy for 20 years

*10,000 RMB/KWh

Total revenue amount for 20 years

*10,000 RMB/KWh

150,000

0.73

0.42

17.25

126

345

It is expected to recoup the cost in four to five years.

  • Construction process

Utilized SC solar mounting system

Installation angle of 20 °

Component specification: 270watts polycrystalline solar panels

Number of components: 596 pieces

The solar arrays of the roof solar plant face to due south

  • Installation effect: